- Introduction
- 
		Evaluation of the ILZRO/RAPS System in Padre Cocha
- 
				Demand Analysis
- Demand Segment Analysis
- Load Forecast
 
- 
				Financial Evaluation
- Capital Costs of the RAPS System and Sources of Funding
- Operation & Maintenance Costs for the RAPS System
- Tariff Structure and Revenues of the RAPS System
- Levelized Cost of the RAPS System
 
- 
				Technical Evaluation
- Sizing
- Design and Installation
- Operation and Waste Treatment
 
- Institutional Evaluation
 
- 
				Demand Analysis
- 
		Recommendations on Future Electricity Supply Options
- 
				Economic Comparison of Electricity Supply Alternative
- Optimum Sizing Results
- Levelized Cost Comparison
 
 
- 
				Economic Comparison of Electricity Supply Alternative
Documents
Year Published
              2007
          